Anticorrosive coating

Product Introduction

A&H.EZ4101-30 epoxy zinc foundation make-up is a two-component zinc rich epoxy polyamide cured primer. Which has the characteristics of hard and wear-resistant paint film. Cathodic protection can be provided for locally damaged areas.
A&H.EZ4101-30 epoxy zinc foundation make-up is a two-component zinc rich epoxy polyamide cured primer. Which has the characteristics of hard and wear-resistant paint film. Cathodic protection can be provided for locally damaged areas.

Main features

·Good impact resistance 

·Excellent anti-corrosion performance

·Good impact resistance 

·Excellent anti-corrosion performance

Typical Uses

·Suitable for anti-corrosion primer for conventional and heavy machinery

·Suitable for use as a primer for steel structures in moderately corrosive environments

·Suitable for anti-corrosion primer for conventional and heavy machinery

·Suitable for use as a primer for steel structures in moderately corrosive environments

Color Gloss

Color: Grey 

Gloss: Matte

Color: Grey 

Gloss: Matte

Product Data


Property

Description

Volume Solids

Approx. 60%

Theoretical Coverage

12 m²/L (at 50 μm dry film thickness)

Temperature Resistance

Max. (dry): 80℃

Flash Point

26℃

Specific Gravity

Approx. 1.9 kg/L

Typical Thickness

40–80 μm (dry film thickness)

The listed data is based on products produced in bulk by the factory, and there may be slight variations due to different colors.

Property

Description

Volume Solids

Approx. 60%

Theoretical Coverage

12 m²/L (at 50 μm dry film thickness)

Temperature Resistance

Max. (dry): 80℃

Flash Point

26℃

Specific Gravity

Approx. 1.9 kg/L

Typical Thickness

40–80 μm (dry film thickness)

The listed data is based on products produced in bulk by the factory, and there may be slight variations due to different colors.

Product composition


Base material: A&H.EZ4101-30-1 component A

Curing agent: A&H.EZ4101-30-2 component B

Mixing ratio: 30kg: 3kg

Diluent/Cleaning Agent: A&H.EZ4101-30-3 Special Diluent

Mixed service life: 4 hours (25 ℃)

This product is packaged separately.




Base material: A&H.EZ4101-30-1 component A

Curing agent: A&H.EZ4101-30-2 component B

Mixing ratio: 30kg: 3kg

Diluent/Cleaning Agent: A&H.EZ4101-30-3 Special Diluent

Mixed service life: 4 hours (25 ℃)

This product is packaged separately.



Construction method

Construction method

Airless spraying

Air spray

Brush/Roll Coating

Diluent addition amount

5%

15%

5%

The above diluents are recommended to be added, and the amount of diluent added on site should be adjusted according to the on-site tools, environment, and required construction film thickness.

Construction method

Airless spraying

Air spray

Brush/Roll Coating

Diluent addition amount

5%

15%

5%

The above diluents are recommended to be added, and the amount of diluent added on site should be adjusted according to the on-site tools, environment, and required construction film thickness.

Substrate processing

New steel: sandblasted to Sa2.5 standard to ensure necessary roughness.
New steel: sandblasted to Sa2.5 standard to ensure necessary roughness.

Construction conditions

The construction surface requires cleanliness and dryness, and the surface temperature should be higher than the dew point to avoid condensation of water vapor. Construction and curing can only proceed normally under temperature conditions above 10 ℃. The surface temperature of the workpiece must also be above this limit. It should be noted that temperatures at or below freezing point can cause the surface to freeze, thereby affecting the adhesion of the paint film. The temperature of the paint itself should be higher than 15 ℃ to ensure normal construction performance. During construction in narrow spaces and dry periods, extensive ventilation should be provided.
The construction surface requires cleanliness and dryness, and the surface temperature should be higher than the dew point to avoid condensation of water vapor. Construction and curing can only proceed normally under temperature conditions above 10 ℃. The surface temperature of the workpiece must also be above this limit. It should be noted that temperatures at or below freezing point can cause the surface to freeze, thereby affecting the adhesion of the paint film. The temperature of the paint itself should be higher than 15 ℃ to ensure normal construction performance. During construction in narrow spaces and dry periods, extensive ventilation should be provided.

Drying and solidification


Surface Dry

Approx. 2 hours (20℃)

Hard Dry

Approx. 12 hours (20℃)

Full Cure

7 days (20℃)


Surface Dry

Approx. 2 hours (20℃)

Hard Dry

Approx. 12 hours (20℃)

Full Cure

7 days (20℃)

Recoating interval

Shortest at 25 ℃: 4 hours

Maximum duration at 25 ℃: 7 days


Shortest at 25 ℃: 4 hours

Maximum duration at 25 ℃: 7 days


Product matching

According to different actual exposure conditions during use, this product can be used in combination with different primers and topcoats. Here are some reference packages. For specific supporting facilities, please contact Hefei A&H New Materials Technology Co., Ltd.

·Previous coating: None

·Next coating: Our epoxy intermediate paint, our acrylic topcoat, and our polyurethane topcoat


According to different actual exposure conditions during use, this product can be used in combination with different primers and topcoats. Here are some reference packages. For specific supporting facilities, please contact Hefei A&H New Materials Technology Co., Ltd.

·Previous coating: None

·Next coating: Our epoxy intermediate paint, our acrylic topcoat, and our polyurethane topcoat


Storage

It must be stored in accordance with national regulations. The storage environment should be dry, cool, well ventilated, and away from heat and fire sources. The packaging container must be kept sealed. Handle with caution.

A&H.EZ4101-30-1 Component A: Shelf life of 12 months at 23 ℃

A&H.EZ4101-30-2 Component B: Shelf life of 12 months at 23 ℃



It must be stored in accordance with national regulations. The storage environment should be dry, cool, well ventilated, and away from heat and fire sources. The packaging container must be kept sealed. Handle with caution.

A&H.EZ4101-30-1 Component A: Shelf life of 12 months at 23 ℃

A&H.EZ4101-30-2 Component B: Shelf life of 12 months at 23 ℃



Attention/Health/Safety/Disclaimer

·This product is only suitable for professional use.

·Please pay attention to the safety precautions on the packaging label. In addition, safety regulations set by relevant national or local governments should also be followed. Avoid inhaling solvent vapors or paint mist, and do not touch the skin or eyes with this product. Strong ventilation must be provided for construction in narrow or poorly ventilated areas. Although the ventilation conditions are good, protective equipment should still be worn.

·The data in this manual was obtained under standard conditions. In actual use, environmental conditions may vary slightly. If there are any changes to the above data, the latest manual of our company shall prevail without further notice.




·This product is only suitable for professional use.

·Please pay attention to the safety precautions on the packaging label. In addition, safety regulations set by relevant national or local governments should also be followed. Avoid inhaling solvent vapors or paint mist, and do not touch the skin or eyes with this product. Strong ventilation must be provided for construction in narrow or poorly ventilated areas. Although the ventilation conditions are good, protective equipment should still be worn.

·The data in this manual was obtained under standard conditions. In actual use, environmental conditions may vary slightly. If there are any changes to the above data, the latest manual of our company shall prevail without further notice.




X