MENU

Anticorrosive coating

Product Introduction

A&H.ECT002-1 thick slurry epoxy coal tar asphalt anti-corrosion coating is a two-component thick slurry asphalt anti-corrosion coating composed of coal tar asphalt and modified epoxy resin. The coating has excellent waterproof and anti-corrosion properties; The paint film dries quickly; The paint film is tough, with excellent physical and mechanical properties, strong adhesion, and meets the requirements of thick paste products in the GB/T 27806-2011 standard.
A&H.ECT002-1 thick slurry epoxy coal tar asphalt anti-corrosion coating is a two-component thick slurry asphalt anti-corrosion coating composed of coal tar asphalt and modified epoxy resin. The coating has excellent waterproof and anti-corrosion properties; The paint film dries quickly; The paint film is tough, with excellent physical and mechanical properties, strong adhesion, and meets the requirements of thick paste products in the GB/T 27806-2011 standard.

Main features

·Good anti-corrosion performance and low anti-corrosion cost

·High single film thickness

·Good anti-corrosion performance and low anti-corrosion cost

·High single film thickness

Typical Uses

·Used for anti-corrosion of the inner and outer walls of sewage tanks 

·Used for anti-corrosion of the inner and outer walls of buried pipelines and seawater pipelines

·Used for anti-corrosion of the inner and outer walls of sewage tanks 

·Used for anti-corrosion of the inner and outer walls of buried pipelines and seawater pipelines

Color Gloss

Color: Black

Gloss: Radiant


Color: Black

Gloss: Radiant


Product Data

Property

Description

Volume Solids

Approx. 70%

Theoretical Coverage

7m²/L (at 100μm DFT)

Temperature Resistance

Max. (dry): 80℃

Flash Point

35℃

Specific Gravity

Approx. 1.65 kg/L

Recommended DFT

80-200μm (dry film thickness)

The listed data is based on products produced in bulk by the factory, and there may be slight variations due to different colors.


Property

Description

Volume Solids

Approx. 70%

Theoretical Coverage

7m²/L (at 100μm DFT)

Temperature Resistance

Max. (dry): 80℃

Flash Point

35℃

Specific Gravity

Approx. 1.65 kg/L

Recommended DFT

80-200μm (dry film thickness)

The listed data is based on products produced in bulk by the factory, and there may be slight variations due to different colors.


Product composition

Base material: A&H.ECT002-1-1 component A

Curing agent: A&H.ECT002-1-2 component B

Mixing ratio: 25kg: 25kg

Diluent/cleaning agent: A&H.ECT002-1-3 epoxy diluent

Mixed service life: 4 hours (25 ℃)

This product is divided into two cans, forming one unit. When used, it should be mixed in pairs according to the prescribed ratio. Once mixed, it must be used within the specified mixing life.


Base material: A&H.ECT002-1-1 component A

Curing agent: A&H.ECT002-1-2 component B

Mixing ratio: 25kg: 25kg

Diluent/cleaning agent: A&H.ECT002-1-3 epoxy diluent

Mixed service life: 4 hours (25 ℃)

This product is divided into two cans, forming one unit. When used, it should be mixed in pairs according to the prescribed ratio. Once mixed, it must be used within the specified mixing life.


Construction method

Application Method

Airless Spray

Conventional Spray

Brush/Roller

Thinner Addition

5%

15%

5%

The above diluents are recommended to be added, and the amount of diluent added on site should be adjusted according to the on-site tools, environment, and required construction film thickness.

Application Method

Airless Spray

Conventional Spray

Brush/Roller

Thinner Addition

5%

15%

5%

The above diluents are recommended to be added, and the amount of diluent added on site should be adjusted according to the on-site tools, environment, and required construction film thickness.

Substrate processing

New steel: sandblasted to Sa2.5 standard or manually polished to St3.0 standard.
New steel: sandblasted to Sa2.5 standard or manually polished to St3.0 standard.

Construction conditions

The construction surface requires cleanliness and dryness, and the surface temperature should be higher than the dew point to avoid condensation of water vapor. Construction and curing can only proceed normally under temperature conditions above 10 ℃. The surface temperature of the workpiece must also be above this limit. It should be noted that temperatures at or below freezing point can cause the surface to freeze, thereby affecting the adhesion of the paint film. The temperature of the paint itself should be higher than 15 ℃ to ensure normal construction performance. During construction in narrow spaces and dry periods, extensive ventilation should be provided.
The construction surface requires cleanliness and dryness, and the surface temperature should be higher than the dew point to avoid condensation of water vapor. Construction and curing can only proceed normally under temperature conditions above 10 ℃. The surface temperature of the workpiece must also be above this limit. It should be noted that temperatures at or below freezing point can cause the surface to freeze, thereby affecting the adhesion of the paint film. The temperature of the paint itself should be higher than 15 ℃ to ensure normal construction performance. During construction in narrow spaces and dry periods, extensive ventilation should be provided.

Drying and solidification

Surface Dry

Approx. 4 hours (20℃)

Hard Dry

Approx. 24 hours (20℃)

Full Cure

7 days (20℃)

Surface Dry

Approx. 4 hours (20℃)

Hard Dry

Approx. 24 hours (20℃)

Full Cure

7 days (20℃)

Recoating interval

Shortest at 25 ℃: 4 hours

Maximum duration at 25 ℃: 7 days


Shortest at 25 ℃: 4 hours

Maximum duration at 25 ℃: 7 days


Product matching

According to different actual exposure conditions during use, this product can be used in combination with different primers and topcoats. Here are some reference packages. For specific supporting facilities, please contact Hefei Anhe New Materials Technology Co., Ltd.

·Previous coating: None or our company's epoxy primer

·Next coating: None


According to different actual exposure conditions during use, this product can be used in combination with different primers and topcoats. Here are some reference packages. For specific supporting facilities, please contact Hefei Anhe New Materials Technology Co., Ltd.

·Previous coating: None or our company's epoxy primer

·Next coating: None


Storage

It must be stored in accordance with national regulations. The storage environment should be dry, cool, well ventilated, and away from heat and fire sources. The packaging container must be kept sealed. Handle with caution.

A&H.ECT002-1-1 Component A: Shelf life of 12 months at 23 ℃

A&H.ECT002-1-2 Component B: Shelf life of 12 months at 23 ℃


It must be stored in accordance with national regulations. The storage environment should be dry, cool, well ventilated, and away from heat and fire sources. The packaging container must be kept sealed. Handle with caution.

A&H.ECT002-1-1 Component A: Shelf life of 12 months at 23 ℃

A&H.ECT002-1-2 Component B: Shelf life of 12 months at 23 ℃


Attention/Health/Safety/Disclaimer

·This product is only suitable for professional use.

·Please pay attention to the safety precautions on the packaging label. In addition, safety regulations set by relevant national or local governments should also be followed. Avoid inhaling solvent vapors or paint mist, and do not touch the skin or eyes with this product. Strong ventilation must be provided for construction in narrow or poorly ventilated areas. Although the ventilation conditions are good, protective equipment should still be worn.

·The data in this manual was obtained under standard conditions. In actual use, environmental conditions may vary slightly. If there are any changes to the above data, the latest manual of our company shall prevail without further notice.





·This product is only suitable for professional use.

·Please pay attention to the safety precautions on the packaging label. In addition, safety regulations set by relevant national or local governments should also be followed. Avoid inhaling solvent vapors or paint mist, and do not touch the skin or eyes with this product. Strong ventilation must be provided for construction in narrow or poorly ventilated areas. Although the ventilation conditions are good, protective equipment should still be worn.

·The data in this manual was obtained under standard conditions. In actual use, environmental conditions may vary slightly. If there are any changes to the above data, the latest manual of our company shall prevail without further notice.





X